Load a project from the topbar to populate clusters and floors.
Drop chips here to deallocate
Allocation Map
Drag from left → drop on map
Map will appear here
Load a project from the topbar to render floors and connectivity.
Report
—
#
Action
Cluster
Component
Dept
Floor
sqm
Floor utilization
Building
Floor
Total
Used
Vacant
Void
True Empty
Real Util%
Building utilization
Building
Total
Used
Vacant
Void
True Empty
Real Util%
Zone utilization connected floors across buildings
Zone
Level
B×F
Total
Used
Vacant
True Empty
Real Util%
Cluster
Total
Allocated
Remaining
Allocated%
Chips
Floors
Buildings
Component
Cluster
Total
Allocated
Remaining
Allocated%
Chips
Floors
Buildings
Element
Component
Cluster
Qty
Area/Unit
Total Area
Cluster
Component
Element
Area/Unit
Total Qty
Total Area
SCENARIO CONTAINS · CLICK A CHIP TO JUMP / TOGGLE
Paste demand from Excel…
Copy a range from your Demand spreadsheet (with the header row included) and paste it below. Click Apply to replace this scenario's demand. Validates the same way as the full Excel import.
Element
Area/Unit
Total Qty
Components
Clusters
Run the Optimizer to generate the Scorecard.
Run the Optimizer to generate the Value Scorecard.
#
Section
Floor
Space Type
Qty
Area (sqm)
Mode
Score
Status
Load data to see Plan Review.
Run the Optimizer to see sensitivity analysis.
Run the Optimizer at least twice with different sensitivity weights (or load different presets) to compare plans.
Load a project to manage constraints.
⚠
↻
Run Optimizer — pre-flight check
Optimizer result — review before applying
Open scenario
Delete scenario
Duplicate this scenario
Creates a new scenario by copying the current one. The clone always includes scenario metadata, demand rows, objective weights, and chip placements. Constraints are scenario-specific — tick the box below to clone them too.
Source scenario
Scenario
—
Save Plan
0 / 220
A plan with this name already exists. Saving will replace the previous version — it cannot be recovered.